NECA Santa Clara Valley – Design for Value Engineering to Increase Job Profits

Neca logo

A contractor should be and stay profitable as long as it has backlog. To improve the profits of
jobs a very detailed Value Engineering (VE) is necessary. Only contractors that can improve
productivity through better management of time, cost and quality will increase backlog’s profits.
Reduction of risk early on in the project will help to improve profits
This course addresses how to prepare and conduct a VE session in order to improve profits
Issues addressed are:

  •  Identification of job risk
  • Labor risk prediction
  • Procurement planning to reduce labor cost
  • Safety plan
  • Technical risk reduction
  • Business risk reduction
  • Integration risk reduction

This full day course will teach the project managers, estimators and field foremen to identify and
reduce all the applicable risk early on in the project start up. Participants will learn the
implementation steps for an effective and consistent Value Engineering process, which will
improve productivity and profits of the projects.
The seminar is based on research conducted by MCA for the construction industry.

.

By: NECA

Event Schedule Details

  • May 10, 2021
    12:00 pm - 4:00 pm
Share This Event
ADD TO YOUR CALENDAR

© 2021 MCA-Soft - WordPress Theme by Kadence Themes

X